Parameter | p | Estimation of difference (95% CI) |
---|---|---|
GAD-7: AIC = 1089.692, BIC = 1125.676 | ||
Group IG to CG | 0.330 | -0.622(-1.884~0.640) |
Time t0 to t2 | < 0.001* | 1.067(0.521~1.612) |
Time t1 to t2 | < 0.001* | 1.778(0.710~1.645) |
Interaction IG*t0 | 0.090 | 0.667(-0.105~1.438) |
Interaction IG*t1 | 0.894 | 0.444(-0.617~0.706) |
LSIZ: AIC = 1113.972, BIC = 1149.956 | ||
Group IG to CG | 0.091 | 0.822(-0.135~1.780) |
Time t0 to t2 | < 0.001* | -2.356(-3.041~-1.670) |
Time t1 to t2 | < 0.001* | -2.400(-3.060~-1.740) |
Interaction IG*t0 to others | 0.059 | -0.933(-1.903~0.036) |
Interaction IG*t1 to others | 0.084 | 0.822(-0.112~1.756) |