Skip to main content

Table 5 Estimates from models predicting standardized PROMIS change scores

From: Assessing the quality of shared decision making for elective orthopedic surgery across a large healthcare system: cross-sectional survey study

  

TJR

Spine

 

b (se)

P

b (se)

P

Mental Health

Intercept

1.69 (0.61)

0.01

1.72 (0.84)

0.04

IPC decision

0.09 (0.14)

0.53

−0.09 (0.18)

0.63

SDM Process

0.16 (0.07)

0.02

−0.02 (0.12)

0.86

Age

−0.03 (0.01)

0.00

−0.01 (0.01)

0.26

Sex (male)

−0.55 (0.18)

0.00

−0.03 (0.29)

0.92

Race (white)

0.90 (0.23)

0.00

0.24 (0.31)

0.43

Physical Health

Intercept

4.46 (0.95)

0.00

4.07 (1.18)

0.00

IPC decision

0.95 (0.20)

0.00

−0.30 (0.44)

0.50

SDM Process

0.25 (0.11)

0.02

−0.14 (0.20)

0.48

Age

−0.04 (0.01)

0.00

−0.02 (0.01)

0.03

Sex (male)

−0.17 (0.33)

0.60

0.25 (0.35)

0.48

Race (white)

0.49 (0.54)

0.37

1.52 (0.57)

0.01

Physical Function

Intercept

2.77 (0.93)

0.00

4.89 (0.80)

0.00

IPC decision

0.51 (0.19)

0.01

−0.62 (0.26)

0.02

SDM Process

0.13 (0.08)

0.08

−0.20 (0.18)

0.26

Age

−0.03 (0.01)

0.00

−0.05 (0.01)

0.00

Sex (male)

0.42 (0.17)

0.02

0.36 (0.22)

0.10

Race (white)

0.66 (0.45)

0.14

1.08 (0.42)

0.01

  1. Note: Values that are bolded indicate they were significant predictors in their model. TJR Total joint replacement, SDM Shared decision making, IPC Informed, patient-centered decision